Life in the Nations - International.
That none shall perish !
Home. Welcome. Healing Room's. The Prophetic voice. Revival call.. News & updates.. Messenger. Photographs. Link's.
Orphanage plans & progress.

We have obtained the land to build the Orphanage on and having had holes bored we found that the land is over the fresh water table.

The cost of building the orphanage was estimated at £6,800.00.  which has now been found and the building is now complete. You can see from the plans opposite the building consists of:
   
    3 Bedroom.
   1 Sitting room/extra bedroom
    2 Kitchen.
   2 Shower.  (1 European)
   2 Toilet.     (1 European)
   1 Stairs going up to the roof  ( for extra space and possibly a                    second story in the future.)
All windows have glass instead of the usual mesh.

Top of page.       First  page        Site Map.         Contact us.      
Orphanage 
Plans & Progress

Here you can see the brickwork has been started and is progressing nicely.  The sign reads:           “Touching Heaven             Orphanage India”
Here you can see the children taking a look at their new home as it’s being built.  But these are but a few of the children abandoned and left to fend for themselves.
Good Foundations: Here you can see our Senior Pastor in India; Pastor Baburao inspecting the steel  frame work laid ready for the concrete to be poured.
Here the children wave to the camera. Soon they will be moving in to their new home and quite possibly the first home for them to ever knoww.
The children in this photo are some of the ones that will be living in this, their new Home
Here you can see how the orphanage building is progressing.  

Its nearly to the roof level.
& shower
& shower
Here you can see the steps going up to the roof and that the roof has had a wall built around it to make it safe for the children to use.
Here you can see Pastor Baburao inspecting the roof of  the building.id.
Here Pastor Baburao can be seen in the foreground of the newly rendered orphanage building.
Here you can see the front of the building with its two separate entrances for the girls and the boys. 
Here you can see the steps going up to the roof and that the roof has had a wall built around it to make it safe for the children to use.
Here you can see the toilet and shower.
Here you can see the roof of the building which is also a large area that can be used for a play area and other things.
Here you can see the final touches being done to the paint work of the building
Here you can see the hand basin  and the tiled walls of  toilet and shower room.
Here you can see the children lying on their new mattresses.  
 Registered Charity No. 1052963